Depot Charging for Business Fleets

Writer: Marketing Team
Marketing Team
2 days ago
5 min read

Electric vans and utes plugged in at commercial depot charging bays

Depot Charging for Business Fleets


Australia's electric vehicle numbers have moved faster than most fleet managers expected. Almost 158,000 electric vehicles were sold here in the first half of 2026, roughly a quarter of all new car sales, and the national electric fleet passed 600,000 vehicles by June. Electric trucks are still a long way behind, at well under one per cent of new truck sales, but electric vans and utes are now a realistic option for most businesses running a light commercial fleet.

What has not kept pace is the site side. Public charging has grown quickly, but much of it was designed for passenger cars rather than vans towing trailers or rigid trucks, and a fleet that depends on public chargers hands over control of its own schedule. Depot charging for business fleets gives that control back, provided the depot can actually deliver the power.


Depot charging for business fleets is a site problem, not a vehicle problem


Fleet electrification is often treated as a procurement exercise: choose the vehicles, order the chargers, done. In practice the vehicles are the straightforward part. Behind every charging bay sits switchboard capacity, cabling, a network connection and some way of managing when power is drawn. Most commercial charging has to happen on private sites such as depots, factory yards, council lots and transport hubs, and a great many of those sites need electrical work before they can support a fleet of any size.

Get that groundwork right and charging becomes a predictable overnight routine. Get it wrong and a business ends up paying for an upgrade it did not need, or discovers at 6am that half the fleet is not ready to leave.


Start with how the fleet actually runs


Charger selection should follow the operating pattern, not the other way around. Before looking at hardware, map out:


  • When vehicles return to the depot and how many hours they sit idle

  • Typical kilometres per shift, and the worst case rather than the average

  • Which vehicles must be ready first in the morning

  • Whether any vehicles come back mid-shift for a top-up

  • Whether drivers take vehicles home, which splits charging across sites


For most urban and suburban light fleets, overnight AC charging is enough. DC fast charging is rarely necessary for a standard car or van fleet, and it is considerably more expensive to install and connect. A vehicle that sits plugged in for ten hours does not need to be charged in forty minutes.


Check what the site can already deliver


Four things decide how far an existing depot can go before anything is upgraded:


  • Supply type. A single-phase supply limits each charge point to around 7 kW, which suits one or two vehicles and quickly falls apart across ten. Three-phase supply lifts each bay to around 22 kW.

  • Spare switchboard capacity. Existing plant, refrigeration, workshop equipment and lighting all have first claim on the site's capacity.

  • Distance from the board to the parking bays. Cable runs and trenching are often the largest single cost in a depot charging project, well ahead of the chargers themselves.

  • Parking layout. Bay geometry, reversing lines and vehicle length decide where charge points can sit safely and whether cables can reach without creating a trip hazard.


Demand charges are the cost that catches businesses out


Most commercial electricity bills include a demand component, based on the highest rate of power the site draws during the billing period rather than total consumption alone. Plug six vans in together at the end of a shift and the depot sets a new peak that it keeps paying for, even if it only happened once.

Charging a fleet at the depot will usually lift the site's peak demand. That can mean changes to the network connection and to the retail tariff, so both are worth reviewing as part of the project rather than after the first bill arrives. This is also the single biggest reason unmanaged charging ruins the business case for a fleet that otherwise stacks up.


Where solar, battery and load management fit


Three pieces of site infrastructure do most of the work of keeping charging costs under control.


Load management


Load management shares the capacity the site already has across all the charge points, throttling or staggering them so the total never exceeds the limit, and prioritising the vehicles that leave first. It is the cheapest way to add charging bays and often removes the need for a connection upgrade altogether. Good systems also watch site demand, available solar and tariff periods, and adjust charging automatically.


Commercial solar


A commercial solar system covers daytime charging well, which suits vehicles that return mid-shift along with the rest of the site's daytime load. Its limitation is timing: solar generates around the middle of the day, while most fleets plug in during the evening, so solar on its own will not flatten an evening demand peak.


Battery storage


Commercial battery storage closes that gap. The battery charges from solar during the day or from the grid in off-peak periods, then discharges into the vehicles during the evening plug-in rush, so the depot draws steadily from the grid instead of spiking. Paired with energy management, it turns a fleet from a cost risk into a flexible load the site can schedule.


The useful way to think about a depot is as one energy system, not four separate purchases. Chargers, solar, storage and controls are sized against each other and against the fleet's timetable.


Build for the fleet you will have in five years


Fleets electrify in stages, usually starting with the light commercial vehicles on predictable routes that return to base every night. The trenching, conduit, cable trays and board capacity should be sized for the full future bay count even when only the first few chargers are installed. Civil work and switchboard upgrades are what cost real money to redo; adding a charge point to a bay that was already prepared for it does not.


Frequently asked questions


Do we need DC fast chargers at our depot?

Usually not. If vehicles return at the end of a shift and stay parked overnight, AC charging covers the energy needed at a much lower installation and connection cost. DC becomes worth considering for vehicles with short turnaround times, high daily kilometres, or heavy vehicles with large batteries.


How do we find out whether our site has enough power?

It starts with a site assessment: the incoming supply and phases, the switchboard's spare capacity, the site's existing demand profile from recent bills, and the distance between the board and the parking area. That assessment is what determines whether chargers can be added to the current connection or whether an upgrade is needed.


Will solar cover our fleet charging?

Partly, and the split depends on when the vehicles are at the depot. Solar does well for daytime and mid-shift charging. For overnight charging it needs battery storage or a managed off-peak schedule to shift that generation into the hours the fleet is actually plugged in.


Will depot charging increase our electricity bill?

Consumption will rise, but the fuel it replaces falls away. The part to watch is the demand component of the bill, which is driven by the site's peak rather than its total. Load management, battery storage and the right tariff are what keep that peak, and the bill, under control.


How many charge points do we need?

Fewer than the vehicle count, in many cases. What matters is dwell time: if vehicles are parked for ten hours and need four, charge points can be shared across the fleet on a managed schedule. Fleets with short dwell times or vehicles leaving at staggered hours need closer to one bay per vehicle.


Planning depot charging for your fleet


Amazon Energy designs and installs EV charging systems for Australian businesses, alongside the commercial solar, battery storage and energy management that sit behind them, for sites across Victoria, New South Wales, Queensland, Western Australia and South Australia. If you are weighing up fleet electrification, the practical starting point is a look at what your depot can already support and what it would take to get to the fleet size you are planning for.



 
 
 