Solar and Battery Incentive Changes in 2027

Writer: Marketing Team
Marketing Team
Nov 6
5 min read
Commercial rooftop solar panel array on an Australian industrial building

Solar and Battery Incentive Changes in 2027 If your business has been weighing up a solar or battery project, the calendar matters more than usual this year. Two separate federal incentive settings change on 1 January 2027, and both of them reduce the support available for a new installation.


Neither change ends the incentives. Both of them shrink what a system installed next year can claim compared with the same system installed before the end of December.


What Is Changing on 1 January 2027


Australia’s rooftop solar and battery incentives both run through the Small-scale Renewable Energy Scheme, administered by the Clean Energy Regulator. Systems create small-scale technology certificates, and the installer typically claims those certificates and passes the value back as an upfront discount on the quote.


Two parts of that calculation step down at the start of 2027.


The first is the solar deeming period. The number of certificates a solar system creates depends partly on how many years of generation the scheme still has left to credit. Systems installed during 2026 are deemed over five years. Systems installed during 2027 are deemed over four. The scheme winds down to a single year by 2030, so this is a scheduled annual reduction rather than a policy surprise.


The second is the battery certificate factor. Battery installations have had their own factor since the federal battery program began, and that factor now reduces every six months rather than once a year. The rate that has applied since May 2026 holds until the end of December, then steps down in January, and again in July.


The practical effect of both changes is the same. A given system size earns fewer certificates in 2027 than it does today, which means a smaller upfront discount on the same project.


What the Solar and Battery Incentive Changes in 2027 Mean for Your Site


For a residential system the difference is noticeable. For a commercial system it scales with size, because the certificate calculation scales with capacity. A larger roof means a larger number of certificates, and a larger reduction when the rate drops.


This matters more this year than in previous step-downs, because the commercial threshold moved. Since 1 October 2026, eligible commercial solar systems up to 1 MW can access the upfront incentive, rather than the earlier limit. That change opened the scheme to factories, warehouses, cold stores, farms and other sites with large roofs and heavy daytime consumption. Those are exactly the projects where a reduced certificate rate makes the biggest difference in absolute terms.


If you are sizing a system in the hundreds of kilowatts, the gap between a December install and a February install is not a rounding error.


There is a second consideration for batteries specifically. The federal battery incentive is calculated on usable capacity, it is capped at the first 50 kWh, and since May 2026 it has applied a tapered rate across capacity bands rather than a flat rate. Larger batteries already earn proportionally less than smaller ones. The January step-down applies on top of that.


Why December Is the Real Deadline, Not January


The certificate rate is set by the installation date, and for certificate purposes the installation date is when the certificate of compliance is issued. That is the end of the process, not the beginning.


A commercial project is not a same-week job. Before anything goes on a roof there is a site assessment, a load profile review, a system design, a network connection application, and in many cases a structural check on the roof itself. Network approval alone can take weeks depending on the distributor and the size of the connection.


Then there is December. Installation calendars fill, suppliers close over the holiday period, and network operators slow down. A project that starts its paperwork in mid-December is realistically a January commissioning, which means it falls under the 2027 settings regardless of when the contract was signed.


If the 2026 rate is the reason you are moving, the project needs to be underway now rather than scoped in December.


What to Do Before the End of the Year


Start with your consumption data. A recent interval or smart meter data set tells you how much of your load sits in daylight hours, which determines whether solar alone is the right answer or whether storage earns its place. This is the single most useful thing you can have ready before a conversation with an installer.


Get the roof assessed early. Age, sheeting type, structural capacity and available area all shape what is actually installable, and discovering a problem late is what pushes projects past a deadline.


Ask about the network connection timeline specifically. For anything beyond a small system, the distributor’s approval process is usually the longest single step and the one least under anyone’s control.


Confirm how certificates are handled in the quote. Most commercial quotes present the certificate value as an upfront discount, but you want it clear in writing which rate the quote assumes and what happens if commissioning slips past 31 December.


Frequently Asked Questions


Are the solar and battery incentives ending in 2027?

No. Both continue. The Small-scale Renewable Energy Scheme runs until 2030, and the federal battery program has funding allocated beyond 2027. What changes on 1 January 2027 is the rate, not the existence of the incentive.

Does the change affect commercial systems or only homes?

Both. The solar deeming period applies to all eligible systems under the scheme, including commercial systems, which can now be up to 1 MW. Because the certificate calculation scales with system size, the reduction is larger in absolute terms on a commercial project.

What date actually determines which rate applies?

The installation date used for certificate creation, which is when the certificate of compliance is issued. Signing a contract or paying a deposit in 2026 does not secure the 2026 rate if the system is commissioned in 2027.

Is it still worth installing in 2027?

In most cases yes. A reduced certificate rate makes a project slightly more expensive upfront, but it does not change the underlying economics of offsetting daytime consumption, which is where the bulk of the return comes from on a commercial site. The incentive is a discount on the project, not the reason for it.

Can state incentives be combined with the federal scheme?

In several states, yes, subject to each program’s own eligibility criteria. State programs change independently of the federal schedule, so it is worth checking what currently applies in your state at the time you are quoting.

How long does a commercial solar project take from first contact to commissioning?

It varies with system size, roof condition and the network distributor, but allow for site assessment, design, network approval and installation scheduling. For anything beyond a small system, planning on a multi-week timeline is more realistic than a multi-day one.


 
 
 